Concrete Crushing - New Retail Park - Featherstone, West Yorkshire

Location: Featherstone, West Yorkshire

Contract Duration: 6 Weeks

Click Here To Enlarge This Photo Of Concrete Crushing - New Retail Park - Featherstone, West Yorkshire Click Here To Enlarge This Photo Of Concrete Crushing - New Retail Park - Featherstone, West Yorkshire
Click Here To Enlarge
Click Here To Enlarge
Swipe

A.R.T. Demolition were contacted to this site to remove the concrete slab to make way for a new retail park, the building which was an old fizzy drinks factory had previously been demolished.

The site consisted of 15,000 square metres of concrete.

After removing the floor slab we then crushed all material on site resulting in 1/3 Type 1 and 2/3 6F2. This is then recycled by using the crushed material in the sub base for the new buildings.

We used our Rubble Master RM90 Crusher, 35ton Excavator and 2x 20ton Excavators.

Site was ready for the rebuild to commence within 6 weeks of A.R.T. Demolition starting work.

Heavy breakers and ripper tooth attachment were used to grub out all structural concrete down to 1 metre.

01 Citb
02 National Demolition Association
03 Constructionline
04 Alcumus Safe Contractor
05 Considerate Constructors
07 Chas
01 Citb
02 National Demolition Association
03 Constructionline
04 Alcumus Safe Contractor
05 Considerate Constructors
07 Chas
01 Citb
02 National Demolition Association
03 Constructionline
04 Alcumus Safe Contractor
05 Considerate Constructors
07 Chas
01 Citb
02 National Demolition Association
03 Constructionline
04 Alcumus Safe Contractor
05 Considerate Constructors
07 Chas

For more information on demolition in Lincoln, Nottingham, Peterborough and the surrounding areas,
contact us today: 07968 024 597 /

Cookies

This website uses cookies. Please let us know if you agree to the use of these cookies :
I Accept I Decline

Privacy Policy | 3rd Party Data Processors | Disable Cookies
Cookies