  • Former Co-op

    Location: Colchester

    Former Co-op

    Asbestos removal and full demolition of the former co-op, Colchester. Our demolition screen was used for the high level areas. We were able to use it along with a crane to prevent any debris falling onto footpaths/roads.

    Our team have worked solidly on this site for 7 weeks.

    Works included stripping of asbestos to the roof area, soft stripping of the building, full demolition and breaking out of the concrete carpark, floor slabs & foundations.

    We will also be using our RM90GO! to crush all ...

    Click Here
  • Watson’s Yard - Lincoln

    Location: Lincoln
    Contract Duration: 2 Weeks

    Watson’s Yard - Lincoln

    We conducted asbestos removal and demolition of Watson’s Yard which I situated next to the busy bus station in Lincoln town centre. A.R.T acted as the principle contractor and provided all welfare and site set up. After demolition was complete we then erected hoarding around the site. Our JCB 86c was used to aid the demolition. Full demolition and hoarding erection was completed in 2 weeks. A.R.T conducted these works in a heavily congested town centre. Works were completed without incident an...

    Click Here
  • Main Street - Scothern

    Location: Scothern
    Contract Duration: 1 Week

    We conducted the demolition of this building which ran along the side of a main road in the village of Scothern. After A.R.T conducted the R&D asbestos survey demolition could commence. This included asbestos removal from several buildings on the site, demolition of the main house and surrounding outhouses and tree removal. We took extra care whilst demolishing the brick build house and outhouse as the bricks were saved for re-use. We used our JS220 to demolish the buildings, a lot of work was d...

    Click Here
  • DeMontford College - Boston

    Location: Boston

    DeMontford College - Boston

    We completed a full demolition of DeMontford College Boston, this included a full size set up as the principal contractor, asbestos removal, demolition, slab and foundation removal including all sub base removal and crushing of 7000 tons. We completed the job in just 10 weeks using our specialised demolition plant equipment, this included 2x 35ton Excavators, 2x 20ton Excavators, Telehandlers, Loading Shovel, Skid Steer & Crusher. A.R.T won this job through competitive tender. We employed 24hr s...

    Click Here
  • Unilever, Coal Road - Leeds

    Location: Leeds

    Unilever, Coal Road - Leeds

    A.R.T was contacted to conduct demolition on a live and very sensitive factory. Protective scaffold were employed on this project we also carried out asbestos removal, hand & mechanical demolition and crushing. The demolition of redundant office directly attached to a 24hr running factory. While undertaking this project we used our 35ton Excavator and Crusher. Stringent health and safety measures were adhered to, managed and put in place with the demolition of this building. Demolition works wer...

    Click Here
  • New Retail Park - Featherstone

    Location: Featherstone
    Contract Duration: 6 Weeks

    New Retail Park - Featherstone

    We were contacted to this site to remove the concrete slab to make way for a new retail park, the building which was an old fizzy drinks factory had previously been demolished. The site consisted of 15,000 square metres of concrete. After removing the floor slab we then crushed all material on site resulting in 1/3 Type 1 and 2/3 6F2. This is then recycled by using the crushed material in the sub base for the new buildings. We used our Rubble Master RM90 Crusher, 35ton Excavator and 2x 20ton Exc...

    Click Here
  • Southview Primary School - Crowland

    Location: Crowland
    Contract Duration: 12 Weeks

    This was a demolition of a 19th century former primary school in Peterborough. Licensed and Non-Licensed asbestos removal, demolition, slab and foundation removal and on site crushing. We completed the job in 12 weeks using our specialised plant such as our JS330, JS220, Telehandler and Crusher. A.R.T was contracted to carry out this sensitive demolition. We had to dig anti-vibration trenches and monitor vibration with sensors around the site.

    Click Here
Demolition

Demolition

We have completed many demolition contracts for a wide range of clients across the Midlands and the rest of the UK.

Read More
Crushing

Crushing

We operate a wide range of specific demolition tools and machines including concrete breakers, crackers and pulverisers.

Read More
Salvage

Salvage

At A.R.T Demolition, we carry out a large amount of salvage and reclamation from our demolition contracts.