  • Aveland School - Billingborough

    Location: Billingborough

    Aveland School - Billingborough

    A.R.T. Demolition won this project in Jan 2014. The scope involved non-licensed and licensed asbestos removal, demolition, salvage, floor slabs, hardstandings and foundation removal, A.R.T. complied the phase construction plan and conducted works as PC, as members of Considerate constructors scheme the environmental and our impact within the village were monitored and managed closely. A target waste recycling rate of 98% was achieved along with donations of school equipment to local schools.

    Click Here
  • Sainsbury’s Store - Lincoln

    Location: Lincoln

    Sainsbury’s Store - Lincoln

    A.R.T. has completed many successful contracts on behalf of Sainsbury’s and this was no exception. The works involved the full demolition of JSR, existing entrance, cash office, ATM and toilet facilities, as well as most of the rear walls etc.

    As with all our retail contracts, the demolition works were undertaken in a live environment. Working with the store and the public with extra banksmen, time limits on our works and general extra hands-on management with permits and surveys were employe...

    Click Here
  • Travis Perkins - Cheltenham

    Location: Cheltenham

    Travis Perkins - Cheltenham

    A.R.T. was instructed to remove asbestos and complete demolition and crushing duties on this former warehouse in Cheltenham for Travis Perkins. The works comprised of both licensed and non-licensed asbestos which was removed via our staff and specialist contractor. The buildings included a re-enforced concrete portal frame and a large office block, all sections of the building had to be pulverised, separating the heavy rebar from the concrete. All rubble was then crushed. The works all went with...

    Click Here
  • DeMontford College - Boston

    Location: Boston

    DeMontford College - Boston

    We completed a full demolition of DeMontford College Boston, this included a full size set up as the principal contractor, asbestos removal, demolition, slab and foundation removal including all sub base removal and crushing of 7000 tons. We completed the job in just 10 weeks using our specialised demolition plant equipment, this included 2x 35ton Excavators, 2x 20ton Excavators, Telehandlers, Loading Shovel, Skid Steer & Crusher. A.R.T won this job through competitive tender. We employed 24hr s...

    Click Here
  • Southview Primary School - Crowland

    Location: Crowland
    Contract Duration: 12 Weeks

    This was a demolition of a 19th century former primary school in Peterborough. Licensed and Non-Licensed asbestos removal, demolition, slab and foundation removal and on site crushing. We completed the job in 12 weeks using our specialised plant such as our JS330, JS220, Telehandler and Crusher. A.R.T was contracted to carry out this sensitive demolition. We had to dig anti-vibration trenches and monitor vibration with sensors around the site.

    Click Here
  • Unilever, Coal Road - Leeds

    Location: Leeds

    Unilever, Coal Road - Leeds

    A.R.T was contacted to conduct demolition on a live and very sensitive factory. Protective scaffold were employed on this project we also carried out asbestos removal, hand & mechanical demolition and crushing. The demolition of redundant office directly attached to a 24hr running factory. While undertaking this project we used our 35ton Excavator and Crusher. Stringent health and safety measures were adhered to, managed and put in place with the demolition of this building. Demolition works wer...

    Click Here
  • Main Street - Scothern

    Location: Scothern
    Contract Duration: 1 Week

    We conducted the demolition of this building which ran along the side of a main road in the village of Scothern. After A.R.T conducted the R&D asbestos survey demolition could commence. This included asbestos removal from several buildings on the site, demolition of the main house and surrounding outhouses and tree removal. We took extra care whilst demolishing the brick build house and outhouse as the bricks were saved for re-use. We used our JS220 to demolish the buildings, a lot of work was d...

    Click Here
  • Watson’s Yard - Lincoln

    Location: Lincoln
    Contract Duration: 2 Weeks

    Watson’s Yard - Lincoln

    We conducted asbestos removal and demolition of Watson’s Yard which I situated next to the busy bus station in Lincoln town centre. A.R.T acted as the principle contractor and provided all welfare and site set up. After demolition was complete we then erected hoarding around the site. Our JCB 86c was used to aid the demolition. Full demolition and hoarding erection was completed in 2 weeks. A.R.T conducted these works in a heavily congested town centre. Works were completed without incident an...

    Click Here
Demolition

Demolition

We have completed many demolition contracts for a wide range of clients across the Midlands and the rest of the UK.

Read More
Crushing

Crushing

We operate a wide range of specific demolition tools and machines including concrete breakers, crackers and pulverisers.

Read More
Salvage

Salvage

At A.R.T Demolition, we carry out a large amount of salvage and reclamation from our demolition contracts.

Read More
Asbestos Removals

Asbestos Removals

We remove and dispose of all types of asbestos based materials, delivering a complete asbestos management solution.

Read More